What is the documentation of the post-implementation focus of construction objects?


Documentation of the post-implementation focus of buildings is geodetic documentation showing the location and course of newly built buildings (construction, utilities …). The processing of documentation is preceded by the geodetic survey of individual buildings. The aiming is performed in the state coordinate system S-JTSK and the altitude system Bpv.

When do I need to prepare documentation of the post-implementation focus? I need to prepare documentation of the post-implementation focus for approval.
The building authority usually requires a geometric plan for approval – a drawing of the new building in the cadastral map and a geodetic post implementation survey of IS connections (the focus is also part of the drawing in the digital technical map of the city).

Price for post-implementation focus of buildings and networks

The price for the post-implementation focus of constructions and networks is influenced by:

range (length of engineering networks, number of connections ..)
expected number of exits (construction stages)
method of processing (various outputs for SPP, ZSE, building authorities …)